SHEET A-500One team from survey pegs to keys

Process

Clear drawings prevent site-day guesswork. Below is every stage from first walkthrough to keys, typical week ranges, what we hand you at each milestone and what we need from you.

Project
Blueline Building Co. · Twin Cities
Drawing Title
Six-Stage Build Sequence
Sheet No.
A-500
Scale
N.T.S.
Rev
R-06
Issued
2026 SET
FULL SEQUENCE · STAGES 01 TO 06TYPICAL COMBINED SPAN: 19–58 WEEKS
  1. 11–2 wks

    Stage 01

    Site visit and brief

    We walk the property with you, measure key constraints, check zoning setbacks and confirm whether your scope fits your target budget range.

    Stage deliverable:Written brief and feasibility notes
  2. 24–10 wks

    Stage 02

    Design and drawings

    We complete a measured survey, draft floor plans and elevations, coordinate structural engineering and price the agreed construction set.

    Stage deliverable:Measured drawings and a fixed quote
  3. 33–8 wks

    Stage 03

    Permits and scheduling

    We file building and trade permits with the city, lock in long-lead windows and steel, and issue a weekly construction schedule.

    Stage deliverable:Approved permits and a start date
  4. 44–16 wks

    Stage 04

    Groundwork and structure

    Excavation, footings, framing, roof structure, windows and exterior weatherproofing take the project from dirt or strip-out to a dry shell.

    Stage deliverable:Foundation, frame and roof closed in
  5. 56–20 wks

    Stage 05

    Services and fit-out

    Licensed mechanical, electrical and plumbing trades rough in and pass inspection, followed by insulation, drywall, cabinetry, tile and trim.

    Stage deliverable:Inspected trades, finishes installed
  6. 61–2 wks

    Stage 06

    Walkthrough and handover

    We walk every room together with blue tape, close out municipal final inspections, clear every snag item and hand over the care binder.

    Stage deliverable:Snag list closed, keys and manuals

Aftercare & Handover Record

One-year workmanship walkthrough & aftercare

Every completed home goes through a full Minnesota seasonal cycle before we call it closed. At month eleven we schedule a complimentary workmanship walkthrough to check doors, trim joints, caulk lines and mechanical balance, and you receive a binder with as-built drawings, paint codes and appliance manuals at handover.

Sample wording for gallery demonstration — full statutory and workmanship terms are set out in each signed build contract.

1-Year Walkthrough · Sample

Revision Notes · Common Questions

Before we draw a line

Click any revision note to open

REV-01Who handles city permits and inspections?
Blueline prepares and submits the building permit set, zoning checklists and trade applications on your behalf, then meets municipal inspectors on site at footing, framing, rough-in, insulation and final stages. Permit fees themselves are passed through at cost.
REV-02Can we live in the house during a renovation or extension?
For contained basement suites or rear additions separated by a temporary dust wall, many homeowners stay put. For full-gut main-floor renovations or second-storey lifts where plumbing, heating or roof cover are open, moving out for the core weeks keeps the build safer, cleaner and faster. We flag this clearly during Stage 1.
REV-03What happens if we want to change something after drawings are signed?
Changes happen. Whenever you ask to move a wall, upgrade glazing or add millwork, we draw a brief change order showing the exact cost and schedule impact in writing before work proceeds — never at the end of the month.
REV-04How is the payment schedule structured?
Design and pre-construction drawings are billed separately so you own the plans before committing to construction. Once a fixed-price build contract is signed, stage draws follow completed physical milestones (foundation, closed-in shell, inspected rough-ins, finishes and final walkthrough). Exact terms are agreed in writing before work begins.
REV-05Do you build through Minnesota winters?
Yes. We schedule excavation and concrete footings before deep freeze whenever possible, or use ground heaters and insulated blankets when winter pours are required. Once framed and closed in, temporary heat lets interior rough-ins and finish carpentry run smoothly from November through March.

Stage 01 starts with a conversation

Ready to talk through timing and feasibility?

Send a note with your neighbourhood, rough goals and ideal window. We’ll reply to arrange a site visit — no obligation and no automated booking.

KitchenLivingNew dining?~14 ft?Start here →